What inspections are typically required?
- Above ceiling
- Conduit
- Electrical wiring
- Energy code compliance
- Final inspection
- Fire and smoke resistant penetrations
- Footing
- Foundation
- Framing
- Gypsum board if part of a shear wall assembly or a fire-rated assembly
- HVAC/Mechanical
- Piping or duct-work if installed under the slab
- Plumbing
- Power to panel
- Retaining walls
- Rough (4-way)
- Sewer lateral
- Under slab if reinforcing steel
- Water service lateral

Show All Answers

1. How can I contact Building Inspections?
2. When is a building permit required?
3. Who can obtain a building permit?
4. What inspections are typically required?
5. How do I schedule a building inspection?
6. What do I do if I have a question about a building inspection?
7. How long does a plan review take?
8. Is over-the-counter plan review available?
9. What are the plan review submittal fees?
10. What are the building permit fees?
11. What is the sanitary sewer impact fee?
12. What are the basic inspection requirements?
13. How do I draw a site plan?